
Digital reconstruction of the Hidroituango Hydroelectric Power Plant, captured Nov 10, 2018. This high-fidelity aerophotogrammetry asset is a crucial historical and technical record of Colombia’s largest energy project during its construction.
Captures the dam, spillway, and geological terrain with professional precision. Essential for infrastructure analysis and disaster management simulation.
Key Technical Features:
- Historical Data: Precise visual record from 2018.
- Engineering Grade: Accurate terrain mapping for GIS integration.
- Utility: Ideal for Digital Twins, VR training, and civil engineering.
- Optimization: Textures ready for Unity, Unreal, and CAD.
Available files:
STL, OBJ, FBX, JPG, GLTF, 3DS, DAE, WRL, OTHER, ABC, PLY, DXF, PDF.
History:
- 10.11.2018: Initial Release.
- 03.02.2023: Updated (VR/AR).
ID: (190)
Price: US$29
CONTACT US / CONTÁCTANOS HERE
BUY HERE

NoAI, Hidroituango, Hydroelectric_Dam, Power_Plant, Photogrammetry, Drone_Capture, Colombia_Infrastructure, Digital_Twin, Energy_Sector, Terrain_Mapping, GIS_Data, Unity_Ready, Unreal_Engine, VR_Training, Precision_Mapping, Civil_Engineering, Industrial_Site, Site_Monitoring











