Hidroituango (Ituango – Colombia)

Files available for download:

  • AutoCAD (DWG).
  • MicroStation (DGN).
  • Adobe Acrobat (PDF).
  • Bitmap Image (JPG).

Visit i-avanzada and browse more Geolocated Layouts.

Key features:

  • Geolocated High Resolution Satellite Orthomosaics: TIF file.
  • Reference coordinate system:
    • MAGNA-SIRGAS / Zona Bogotá – Colombia / EPSG 3116.
  • Units: Meters [m].
  • Paper size: DIN A1 (841x594mm).
  • Print scale: 1=1.
  • Updatable over the time.

Project overview:

Hidroituango, on the Cauca River in Colombia, is one of the largest hydroelectric projects, aiming to generate 2,400 megawatts, meeting about 17% of the nation’s electricity demand.

Situated in Ituango, Antioquia, Colombia.

The biggest project in hydroelectric power generation in Colombia, currently under construction on the Cauca River near the municipality of Ituango in Antioquia Department, Colombia.

8 turbines, Francis type, rated at 307 MW each one, for an installed capacity 2.456 MW

Preliminary construction on the dam began in 2011 and the power plant was expected to begin operations in late 2018, but due heavy rainfall and landslides in 2018 blocked the river’s diversion tunnel, threatening a breach of the dam.

The Hidroituango project, initially estimated at $2.5 billion USD, has seen its cost rise to over $5 billion USD, reflecting a significant increase due to technical challenges and unforeseen contingencies.

En el río Cauca, Hidroituango se levanta como uno de los proyectos hidroeléctricos más grandes de América Latina, con una potencia de 2,400 MW y que abastecerá el 17% de la energía del país.

As – Built (1/2023)
AIRBUS / SCALE 1=2500

As – Built.
BING / SCALE 1=2500

Construction.
MAXAR / SCALE 1=2500

Hidroituango Hydroelectric Power Plant 10.11.2018 3D model

CONTACT US / CONTÁCTANOS HERE

BUY HERE

1079GL. HIDROITUANGO – Ituango 17.12.2024

(1079GL)